Building occlusion
The central 12 m structure interrupts parts of the geometric coverage.
Anonymous frozen demo · DEMO-CAM-01
Inspect a synthetic 300 m × 200 m facility with six cameras, a central building, estimated vegetation and a controlled NoData corner.

Buildings, perimeter geometry and vegetation visibly affect the model before a design is handed to a practitioner.
Nominal pixel-density geometry is useful only when the scene limitations stay visible and field conditions remain a practitioner responsibility.
The central 12 m structure interrupts parts of the geometric coverage.
The vegetation obstruction is explicitly estimated rather than presented as measured canopy height.
The missing surface area remains unknown and is omitted from a clean coverage claim.
The exact scene is synthetic and has not been measured at an identifiable operational site.
| Source | Publisher | Grade / type | Resolution | Datum | Health |
|---|---|---|---|---|---|
| fixture-site-surface-v1 | SighThor test fixtures | Preview · synthetic terrain, building and NoData geometry | 1 m | SYNTHETIC-AMSL | current |
| fixture-vegetation-v1 | SighThor test fixtures | Preview · synthetic estimated vegetation polygon | 1 m | SYNTHETIC-AMSL | current |
The demo proves deterministic product behaviour, not measured performance under real lighting, focus, motion, compression, weather or privacy constraints.